Engineer's instruction to construct draining box around building ground of BRAC University new campus project

This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.

Λεπτομέρειες βιβλιογραφικής εγγραφής
Κύριος συγγραφέας: BUCG-ABC Joint Venture (BUCG-ABC JV)
Μορφή: General correspondence
Γλώσσα:English
Έκδοση: Brac University 2023
Θέματα:
Διαθέσιμο Online:http://hdl.handle.net/10361/20446
id 10361-20446
record_format dspace
spelling 10361-204462023-10-08T10:51:35Z Engineer's instruction to construct draining box around building ground of BRAC University new campus project BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project General correspondence Engineer’s instruction Draining box This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project. 2023-09-03T10:22:01Z 2023-09-03T10:22:01Z ©2019 2019-11-02 General correspondence Ref. no.: BUCG-ABC JV/BRACU/125/19 http://hdl.handle.net/10361/20446 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 3 pages application/pdf Brac University
institution Brac University
collection Institutional Repository
language English
topic New campus project
General correspondence
Engineer’s instruction
Draining box
spellingShingle New campus project
General correspondence
Engineer’s instruction
Draining box
BUCG-ABC Joint Venture (BUCG-ABC JV)
Engineer's instruction to construct draining box around building ground of BRAC University new campus project
description This record consists of general correspondence regarding the engineer's instruction to construct draining box around building ground of BRAC University new campus project.
format General correspondence
author BUCG-ABC Joint Venture (BUCG-ABC JV)
author_facet BUCG-ABC Joint Venture (BUCG-ABC JV)
author_sort BUCG-ABC Joint Venture (BUCG-ABC JV)
title Engineer's instruction to construct draining box around building ground of BRAC University new campus project
title_short Engineer's instruction to construct draining box around building ground of BRAC University new campus project
title_full Engineer's instruction to construct draining box around building ground of BRAC University new campus project
title_fullStr Engineer's instruction to construct draining box around building ground of BRAC University new campus project
title_full_unstemmed Engineer's instruction to construct draining box around building ground of BRAC University new campus project
title_sort engineer's instruction to construct draining box around building ground of brac university new campus project
publisher Brac University
publishDate 2023
url http://hdl.handle.net/10361/20446
work_keys_str_mv AT bucgabcjointventurebucgabcjv engineersinstructiontoconstructdrainingboxaroundbuildinggroundofbracuniversitynewcampusproject
_version_ 1814307288366710784