Response in material consumption supplied by employer of BRAC University new campus project
This record consists of general correspondence regarding response in material consumption supplied by employer of BRAC University new campus project.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20442 |
Podobne zapisy
-
Submission of the cement consumption breakdown reports of BRAC University new campus project
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Interim payment application no. 008, material consumption supplied by employer
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Brand of the supplied cement for BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Submission of material consumption statement with each RA bill
od: Brac University
Wydane: (2023) -
Regarding emergency RMC supply for BRAC University new campus project
od: BUCG-ABC Joint Venture
Wydane: (2023)