Response in material consumption supplied by employer of BRAC University new campus project
This record consists of general correspondence regarding response in material consumption supplied by employer of BRAC University new campus project.
Hoofdauteur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20442 |
Gelijkaardige items
-
Submission of the cement consumption breakdown reports of BRAC University new campus project
door: BUCG-ABC Joint Venture
Gepubliceerd in: (2023) -
Interim payment application no. 008, material consumption supplied by employer
door: BUCG-ABC Joint Venture
Gepubliceerd in: (2023) -
Brand of the supplied cement for BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Submission of material consumption statement with each RA bill
door: Brac University
Gepubliceerd in: (2023) -
Regarding emergency RMC supply for BRAC University new campus project
door: BUCG-ABC Joint Venture
Gepubliceerd in: (2023)