Removal of rebar stacked at the west of the engineer office
This record consists of general correspondence regarding the removal of rebar stacked at the west of the engineer office of BRACU new campus development project.
Tác giả chính: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/20430 |
Những quyển sách tương tự
-
Removing rebar without notice
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Regarding removing stacked materials for construction purpose
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Request for confirmation concerning valuation for cutting rebar of foundation piles
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Resubmission of cutting hosting rebar of foundation piles
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)