Removal of rebar stacked at the west of the engineer office
This record consists of general correspondence regarding the removal of rebar stacked at the west of the engineer office of BRACU new campus development project.
Yazar: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20430 |
Benzer Materyaller
-
Removing rebar without notice
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Regarding removing stacked materials for construction purpose
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Request for confirmation concerning valuation for cutting rebar of foundation piles
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Resubmission of cutting hosting rebar of foundation piles
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023)