Removal of rebar stacked at the west of the engineer office
This record consists of general correspondence regarding the removal of rebar stacked at the west of the engineer office of BRACU new campus development project.
Главный автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20430 |
Схожие документы
-
Removing rebar without notice
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Regarding removing stacked materials for construction purpose
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Request for confirmation concerning valuation for cutting rebar of foundation piles
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Resubmission of cutting hosting rebar of foundation piles
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023)