Removal of rebar stacked at the west of the engineer office
This record consists of general correspondence regarding the removal of rebar stacked at the west of the engineer office of BRACU new campus development project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20430 |
類似資料
-
Removing rebar without notice
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Regarding removing stacked materials for construction purpose
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Request for confirmation concerning valuation for cutting rebar of foundation piles
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Resubmission of cutting hosting rebar of foundation piles
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023)