Removal of rebar stacked at the west of the engineer office
This record consists of general correspondence regarding the removal of rebar stacked at the west of the engineer office of BRACU new campus development project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20430 |
Παρόμοια τεκμήρια
-
Removing rebar without notice
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Regarding removing stacked materials for construction purpose
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Request for confirmation concerning valuation for cutting rebar of foundation piles
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Resubmission of cutting hosting rebar of foundation piles
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023)