JV), B. J. V. (. (2023). Removal of rebar stacked at the west of the engineer office. Brac University.
Cita Chicago Style (17a ed.)JV), BUCG-ABC Joint Venture (BUCG-ABC. Removal of Rebar Stacked at the West of the Engineer Office. Brac University, 2023.
Cita MLA (8a ed.)JV), BUCG-ABC Joint Venture (BUCG-ABC. Removal of Rebar Stacked at the West of the Engineer Office. Brac University, 2023.
Precaución: Estas citas no son 100% exactas.