JV), B. J. V. (. (2023). Removal of rebar stacked at the west of the engineer office. Brac University.
Citace podle Chicago (17th ed.)JV), BUCG-ABC Joint Venture (BUCG-ABC. Removal of Rebar Stacked at the West of the Engineer Office. Brac University, 2023.
Citace podle MLA (8th ed.)JV), BUCG-ABC Joint Venture (BUCG-ABC. Removal of Rebar Stacked at the West of the Engineer Office. Brac University, 2023.
Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..