VO#028 Proposal of shoring pile works at zone C
This record consists of general correspondence regarding the proposal of shoring pile works at zone C according to specifications, drawings and engineers' instruction for BRACU new campus project.
Yazar: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20413 |
Benzer Materyaller
-
Construction of shore pile in zone C
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Evaluation for additional work of shoring pile work in zone B
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Notice: Commencing the retaining pile and jet grouting pile in Zone C
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Evaluation for additional work of shoring pile work in zone B
Yazar:: BUCG-ABC Joint Venture
Baskı/Yayın Bilgisi: (2023) -
Regarding the effect of zone C earth excavation on reinforcement approach
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023)