VO#028 Proposal of shoring pile works at zone C
This record consists of general correspondence regarding the proposal of shoring pile works at zone C according to specifications, drawings and engineers' instruction for BRACU new campus project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/20413 |
類似資料
-
Construction of shore pile in zone C
著者:: Brac University
出版事項: (2023) -
Evaluation for additional work of shoring pile work in zone B
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Notice: Commencing the retaining pile and jet grouting pile in Zone C
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Evaluation for additional work of shoring pile work in zone B
著者:: BUCG-ABC Joint Venture
出版事項: (2023) -
Regarding the effect of zone C earth excavation on reinforcement approach
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023)