VO#028 Proposal of shoring pile works at zone C
This record consists of general correspondence regarding the proposal of shoring pile works at zone C according to specifications, drawings and engineers' instruction for BRACU new campus project.
Príomhchruthaitheoir: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20413 |
Míreanna comhchosúla
-
Construction of shore pile in zone C
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Evaluation for additional work of shoring pile work in zone B
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Notice: Commencing the retaining pile and jet grouting pile in Zone C
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Evaluation for additional work of shoring pile work in zone B
de réir: BUCG-ABC Joint Venture
Foilsithe / Cruthaithe: (2023) -
Regarding the effect of zone C earth excavation on reinforcement approach
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023)