VO#028 Proposal of shoring pile works at zone C
This record consists of general correspondence regarding the proposal of shoring pile works at zone C according to specifications, drawings and engineers' instruction for BRACU new campus project.
Päätekijä: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20413 |
Samankaltaisia teoksia
-
Construction of shore pile in zone C
Tekijä: Brac University
Julkaistu: (2023) -
Evaluation for additional work of shoring pile work in zone B
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Notice: Commencing the retaining pile and jet grouting pile in Zone C
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Evaluation for additional work of shoring pile work in zone B
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023) -
Regarding the effect of zone C earth excavation on reinforcement approach
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023)