VO#028 Proposal of shoring pile works at zone C
This record consists of general correspondence regarding the proposal of shoring pile works at zone C according to specifications, drawings and engineers' instruction for BRACU new campus project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/20413 |
Παρόμοια τεκμήρια
-
Construction of shore pile in zone C
ανά: Brac University
Έκδοση: (2023) -
Evaluation for additional work of shoring pile work in zone B
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Notice: Commencing the retaining pile and jet grouting pile in Zone C
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Evaluation for additional work of shoring pile work in zone B
ανά: BUCG-ABC Joint Venture
Έκδοση: (2023) -
Regarding the effect of zone C earth excavation on reinforcement approach
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023)