VO#028 Proposal of shoring pile works at zone C
This record consists of general correspondence regarding the proposal of shoring pile works at zone C according to specifications, drawings and engineers' instruction for BRACU new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20413 |
مواد مشابهة
-
Construction of shore pile in zone C
بواسطة: Brac University
منشور في: (2023) -
Evaluation for additional work of shoring pile work in zone B
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Notice: Commencing the retaining pile and jet grouting pile in Zone C
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Evaluation for additional work of shoring pile work in zone B
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Regarding the effect of zone C earth excavation on reinforcement approach
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)