Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B
This record consists of general correspondence regarding the response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B of BRACU new campus development project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
语言: | English |
出版: |
Brac University
2023
|
主题: | |
在线阅读: | http://hdl.handle.net/10361/20408 |
相似书籍
-
Evaluation for additional work of shoring pile work in zone B
由: BUCG-ABC Joint Venture
出版: (2023) -
Evaluation for additional work of shoring pile work in zone B
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Evaluation for additional work of shoring pile work between zone B
由: Brac University
出版: (2023) -
Evaluation for additional work of sharing pile work between zone A and zone C – 05.04.18
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Evaluation for additional work of shoring pile work between zone A and C
由: Brac University
出版: (2023)