Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B
This record consists of general correspondence regarding the response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B of BRACU new campus development project.
Päätekijä: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20408 |
Samankaltaisia teoksia
-
Evaluation for additional work of shoring pile work in zone B
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023) -
Evaluation for additional work of shoring pile work in zone B
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Evaluation for additional work of shoring pile work between zone B
Tekijä: Brac University
Julkaistu: (2023) -
Evaluation for additional work of sharing pile work between zone A and zone C – 05.04.18
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Evaluation for additional work of shoring pile work between zone A and C
Tekijä: Brac University
Julkaistu: (2023)