Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B
This record consists of general correspondence regarding the response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B of BRACU new campus development project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/20408 |
Ítems similars
-
Evaluation for additional work of shoring pile work in zone B
per: BUCG-ABC Joint Venture
Publicat: (2023) -
Evaluation for additional work of shoring pile work in zone B
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Evaluation for additional work of shoring pile work between zone B
per: Brac University
Publicat: (2023) -
Evaluation for additional work of sharing pile work between zone A and zone C – 05.04.18
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Evaluation for additional work of shoring pile work between zone A and C
per: Brac University
Publicat: (2023)