Clarification of instruction
This record consists of general correspondence regarding the clarification of instruction of BRACU new campus development project.
Hoofdauteur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20407 |
Gelijkaardige items
-
Clarification of instruction
door: Brac University
Gepubliceerd in: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Request for clarification on catwalk and auditorium structure and spiral staircase
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Further clarification on amendment of earth excavation depth (Rev.01)
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)