Clarification of instruction
This record consists of general correspondence regarding the clarification of instruction of BRACU new campus development project.
Príomhchruthaitheoir: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/20407 |
Míreanna comhchosúla
-
Clarification of instruction
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Request for clarification on catwalk and auditorium structure and spiral staircase
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Further clarification on amendment of earth excavation depth (Rev.01)
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023)