Clarification of instruction
This record consists of general correspondence regarding the clarification of instruction of BRACU new campus development project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/20407 |
Ítems similars
-
Clarification of instruction
per: Brac University
Publicat: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Request for clarification on catwalk and auditorium structure and spiral staircase
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Further clarification on amendment of earth excavation depth (Rev.01)
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023)