Clarification of instruction
This record consists of general correspondence regarding the clarification of instruction of BRACU new campus development project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20407 |
مواد مشابهة
-
Clarification of instruction
بواسطة: Brac University
منشور في: (2023) -
Clarification on the architectural wall in substructure of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Request for clarification on catwalk and auditorium structure and spiral staircase
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Further clarification on amendment of earth excavation depth (Rev.01)
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)