Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
This record consists of general correspondence regarding clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project.
मुख्य लेखक: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20398 |
समान संसाधन
-
Quotation for the additional wall attached to the diaphragm wall of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Additional wall attached to diaphragm wall
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Revised proposal for additional wall attached to diaphragm wall of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture
प्रकाशित: (2023) -
Quotation for the additional wall attached to the diaphragm wall
द्वारा: Brac University
प्रकाशित: (2023) -
Regarding the testing holes in the diaphragm wall of BRAC University new campus project
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023)