Clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project
This record consists of general correspondence regarding clarification on quotation for additional wall attached to diaphragm wall of BRAC University new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20398 |
مواد مشابهة
-
Quotation for the additional wall attached to the diaphragm wall of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Additional wall attached to diaphragm wall
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Revised proposal for additional wall attached to diaphragm wall of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Quotation for the additional wall attached to the diaphragm wall
بواسطة: Brac University
منشور في: (2023) -
Regarding the testing holes in the diaphragm wall of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)