Outstanding design conditions as of 27 April, 2020
This record consists of general correspondence regarding the request to confirm the outstanding design conditions including kitchen style, swimming pool, AC, server room etc. for BRACU new campus project.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20392 |
Podobne zapisy
-
Re: Outstanding design conditions as of 27 April, 2020
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
od: Brac University
Wydane: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
od: BUCG
Wydane: (2023) -
Roof irrigation system drawing for playground & swimming pool
od: Electro-Mechanical Control Services (EMCS)
Wydane: (2023) -
Detail in contemporary kitchen design /
od: McLeod, Virginia
Wydane: (2008)