Outstanding design conditions as of 27 April, 2020
This record consists of general correspondence regarding the request to confirm the outstanding design conditions including kitchen style, swimming pool, AC, server room etc. for BRACU new campus project.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20392 |
Documenti analoghi
-
Re: Outstanding design conditions as of 27 April, 2020
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
di: Brac University
Pubblicazione: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
di: BUCG
Pubblicazione: (2023) -
Roof irrigation system drawing for playground & swimming pool
di: Electro-Mechanical Control Services (EMCS)
Pubblicazione: (2023) -
Detail in contemporary kitchen design /
di: McLeod, Virginia
Pubblicazione: (2008)