Outstanding design conditions as of 27 April, 2020
This record consists of general correspondence regarding the request to confirm the outstanding design conditions including kitchen style, swimming pool, AC, server room etc. for BRACU new campus project.
मुख्य लेखक: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/20392 |
समान संसाधन
-
Re: Outstanding design conditions as of 27 April, 2020
द्वारा: BUCG-ABC Joint Venture (BUCG-ABC JV)
प्रकाशित: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
द्वारा: Brac University
प्रकाशित: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
द्वारा: BUCG
प्रकाशित: (2023) -
Roof irrigation system drawing for playground & swimming pool
द्वारा: Electro-Mechanical Control Services (EMCS)
प्रकाशित: (2023) -
Detail in contemporary kitchen design /
द्वारा: McLeod, Virginia
प्रकाशित: (2008)