Outstanding design conditions as of 27 April, 2020
This record consists of general correspondence regarding the request to confirm the outstanding design conditions including kitchen style, swimming pool, AC, server room etc. for BRACU new campus project.
מחבר ראשי: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
פורמט: | General correspondence |
שפה: | English |
יצא לאור: |
Brac University
2023
|
נושאים: | |
גישה מקוונת: | http://hdl.handle.net/10361/20392 |
פריטים דומים
-
Re: Outstanding design conditions as of 27 April, 2020
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
מאת: Brac University
יצא לאור: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
מאת: BUCG
יצא לאור: (2023) -
Roof irrigation system drawing for playground & swimming pool
מאת: Electro-Mechanical Control Services (EMCS)
יצא לאור: (2023) -
Detail in contemporary kitchen design /
מאת: McLeod, Virginia
יצא לאור: (2008)