Outstanding design conditions as of 27 April, 2020
This record consists of general correspondence regarding the request to confirm the outstanding design conditions including kitchen style, swimming pool, AC, server room etc. for BRACU new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/20392 |
Ejemplares similares
-
Re: Outstanding design conditions as of 27 April, 2020
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
por: Brac University
Publicado: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
por: BUCG
Publicado: (2023) -
Roof irrigation system drawing for playground & swimming pool
por: Electro-Mechanical Control Services (EMCS)
Publicado: (2023) -
Detail in contemporary kitchen design /
por: McLeod, Virginia
Publicado: (2008)