Outstanding design conditions as of 27 April, 2020
This record consists of general correspondence regarding the request to confirm the outstanding design conditions including kitchen style, swimming pool, AC, server room etc. for BRACU new campus project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20392 |
مواد مشابهة
-
Re: Outstanding design conditions as of 27 April, 2020
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
بواسطة: BUCG
منشور في: (2023) -
Roof irrigation system drawing for playground & swimming pool
بواسطة: Electro-Mechanical Control Services (EMCS)
منشور في: (2023) -
Detail in contemporary kitchen design /
بواسطة: McLeod, Virginia
منشور في: (2008)