Re: Completing all the M&E design immediately to be reviewed by Transsolar

This record consists of general correspondence regarding the completion of M&E design immediately to be reviewed by Transsolar for BRACU new campus project.

التفاصيل البيبلوغرافية
المؤلف الرئيسي: BUCG-ABC Joint Venture (BUCG-ABC JV)
التنسيق: General correspondence
اللغة:English
منشور في: Brac University 2023
الموضوعات:
الوصول للمادة أونلاين:http://hdl.handle.net/10361/20390