Re: Outstanding design conditions as of 27 April, 2020
This record consists of general correspondence regarding the submission of conceptual design of swimming pool of BRACU new campus project.
Autor Principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado: |
Brac University
2023
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/20386 |
Títulos similares
-
Outstanding design conditions as of 27 April, 2020
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
por: Brac University
Publicado: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
por: BUCG
Publicado: (2023) -
Roof irrigation system drawing for playground & swimming pool
por: Electro-Mechanical Control Services (EMCS)
Publicado: (2023) -
Request of closing the outstanding issues of design services of BUCG
por: BUCG
Publicado: (2023)