Re: Outstanding design conditions as of 27 April, 2020
This record consists of general correspondence regarding the submission of conceptual design of swimming pool of BRACU new campus project.
প্রধান লেখক: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/20386 |
অনুরূপ উপাদানগুলি
-
Outstanding design conditions as of 27 April, 2020
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
অনুযায়ী: BUCG
প্রকাশিত: (2023) -
Roof irrigation system drawing for playground & swimming pool
অনুযায়ী: Electro-Mechanical Control Services (EMCS)
প্রকাশিত: (2023) -
Request of closing the outstanding issues of design services of BUCG
অনুযায়ী: BUCG
প্রকাশিত: (2023)