The calculation of additional excavation for waterproofing
This record consists of general correspondence regarding the calculation of additional excavation for waterproofing of BRACU new campus development project.
Автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/20384 |
Схожі ресурси
-
Re-submit the evaluation for additional work of waterproofing
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Pre-qualification documents for waterproofing subcontractor
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Pre-qualification documents for waterproofing subcontractor
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
за авторством: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубліковано: (2023)