The calculation of additional excavation for waterproofing
This record consists of general correspondence regarding the calculation of additional excavation for waterproofing of BRACU new campus development project.
1. Verfasser: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/20384 |
Ähnliche Einträge
-
Re-submit the evaluation for additional work of waterproofing
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Pre-qualification documents for waterproofing subcontractor
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Pre-qualification documents for waterproofing subcontractor
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
von: BUCG-ABC Joint Venture (BUCG-ABC JV)
Veröffentlicht: (2023)