The calculation of additional excavation for waterproofing
This record consists of general correspondence regarding the calculation of additional excavation for waterproofing of BRACU new campus development project.
Hovedforfatter: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/20384 |
Lignende værker
-
Re-submit the evaluation for additional work of waterproofing
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Pre-qualification documents for waterproofing subcontractor
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Pre-qualification documents for waterproofing subcontractor
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)