The calculation of additional excavation for waterproofing
This record consists of general correspondence regarding the calculation of additional excavation for waterproofing of BRACU new campus development project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20384 |
Eitemau Tebyg
-
Re-submit the evaluation for additional work of waterproofing
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Pre-qualification documents for waterproofing subcontractor
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Pre-qualification documents for waterproofing subcontractor
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)