The calculation of additional excavation for waterproofing
This record consists of general correspondence regarding the calculation of additional excavation for waterproofing of BRACU new campus development project.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20384 |
مواد مشابهة
-
Re-submit the evaluation for additional work of waterproofing
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Pre-qualification documents for waterproofing subcontractor
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Pre-qualification documents for waterproofing subcontractor
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)