Re: Reminder of submitting the coordinated drawing on M&E design
This record consists of general correspondence regarding the reminder to submit the coordinated drawing on M&E design for BRACU new campus project.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/20381 |
Documenti analoghi
-
Re: Completing all the M&E design immediately to be reviewed by Transsolar
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Re: All the M&E design immediately to be reviewed by the Transsolar
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Regarding shop drawing coordination meeting
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Coordination drawing of ground storey (Architectural As Built Drawings)
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2024)