Re: Reminder of submitting the coordinated drawing on M&E design
This record consists of general correspondence regarding the reminder to submit the coordinated drawing on M&E design for BRACU new campus project.
Prif Awdur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20381 |
Eitemau Tebyg
-
Re: Completing all the M&E design immediately to be reviewed by Transsolar
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Re: All the M&E design immediately to be reviewed by the Transsolar
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Regarding shop drawing coordination meeting
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Coordination drawing of ground storey (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024)