Re: Resumption of project work
This record consists of general correspondence regarding the request not to resume BRACU new campus project work in pandemic situation.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20379 |
Podobne zapisy
-
Resumption of work from quarantine
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Further request to borrow money for resuming work
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Re: Regarding cable laying work by DESCO through the project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Re: Regarding withdrawal of suspension of project work
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Re: Regarding withdrawal of suspension of project work
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)