Re-submit the evaluation for additional work of waterproofing
This record consists of general correspondence regarding re-submit the evaluation for additional work of waterproofing of BRACU new campus development project.
Հիմնական հեղինակ: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Ձևաչափ: | General correspondence |
Լեզու: | English |
Հրապարակվել է: |
Brac University
2023
|
Խորագրեր: | |
Առցանց հասանելիություն: | http://hdl.handle.net/10361/20375 |
Նմանատիպ նյութեր
-
The calculation of additional excavation for waterproofing
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
: Brac University
Հրապարակվել է: (2023)