Re-submit the evaluation for additional work of waterproofing
This record consists of general correspondence regarding re-submit the evaluation for additional work of waterproofing of BRACU new campus development project.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/20375 |
Similar Items
-
The calculation of additional excavation for waterproofing
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Re: Instruction on the type of waterproofing treatment to be done in different location
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
by: Brac University
Published: (2023)