The engineer's observation and instruction regarding the concreting works at utility portion
This record consists of general correspondence regarding the engineer's observation and instruction regarding the concreting works at utility portion of BRAC University new campus project.
Главный автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/20367 |
Схожие документы
-
The engineer's observation and instruction regarding the concreting works at utility portion
по: Brac University
Опубликовано: (2023) -
The engineer's observation and instruction regarding the concreting works at utility portion
по: Brac University
Опубликовано: (2023) -
Regarding mix design of the concrete of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Delayed submission of check list for concreting work of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Request to change concrete grade C10 into C15 for lean/blinding concrete
по: BUCG-ABC Joint Venture
Опубликовано: (2023)