Resubmission of quantity details of first batch for prefabricated steel structure of BRAC University new campus project
This record consists of general correspondence regarding resubmission of quantity details of first batch for prefabricated steel structure of BRAC University new campus project.
Yazar: | BUCG-ABC Joint Venture |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20347 |
Benzer Materyaller
-
Resubmission of quantity details for first batch prefabricated steel structure
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Quantity details of the first and second batch of prefabricated steel structure of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Quantity confirmation of embedded supporting members underground for prefabricated steel structure of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Quantity confirmation of embedded supporting members underground for prefabricated steel structure
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023)