Resubmission of quantity details of first batch for prefabricated steel structure of BRAC University new campus project
This record consists of general correspondence regarding resubmission of quantity details of first batch for prefabricated steel structure of BRAC University new campus project.
Hoofdauteur: | BUCG-ABC Joint Venture |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20347 |
Gelijkaardige items
-
Resubmission of quantity details for first batch prefabricated steel structure
door: Brac University
Gepubliceerd in: (2023) -
Quantity details of the first and second batch of prefabricated steel structure of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Quantity confirmation of embedded supporting members underground for prefabricated steel structure of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Quantity confirmation of embedded supporting members underground for prefabricated steel structure
door: Brac University
Gepubliceerd in: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)