Resubmission of quantity details of first batch for prefabricated steel structure of BRAC University new campus project
This record consists of general correspondence regarding resubmission of quantity details of first batch for prefabricated steel structure of BRAC University new campus project.
Päätekijä: | BUCG-ABC Joint Venture |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20347 |
Samankaltaisia teoksia
-
Resubmission of quantity details for first batch prefabricated steel structure
Tekijä: Brac University
Julkaistu: (2023) -
Quantity details of the first and second batch of prefabricated steel structure of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Quantity confirmation of embedded supporting members underground for prefabricated steel structure of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Quantity confirmation of embedded supporting members underground for prefabricated steel structure
Tekijä: Brac University
Julkaistu: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023)