Resubmission of quantity details of first batch for prefabricated steel structure of BRAC University new campus project
This record consists of general correspondence regarding resubmission of quantity details of first batch for prefabricated steel structure of BRAC University new campus project.
1. autor: | BUCG-ABC Joint Venture |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/20347 |
Podobne zapisy
-
Resubmission of quantity details for first batch prefabricated steel structure
od: Brac University
Wydane: (2023) -
Quantity details of the first and second batch of prefabricated steel structure of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Quantity confirmation of embedded supporting members underground for prefabricated steel structure of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Quantity confirmation of embedded supporting members underground for prefabricated steel structure
od: Brac University
Wydane: (2023) -
Clarification on material grade change for prefabricated steel structure of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)