Work Interface of high voltage electrical and IFC drawings of BRAC University new campus project
This record consists of general correspondence regarding work Interface of high voltage electrical and IFC drawings of BRAC University new campus project.
Huvudupphovsman: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/20340 |
Liknande verk
-
Work interface of high voltage electrical and IFC drawing
av: Brac University
Publicerad: (2023) -
Regarding providing the revised IFC drawing of plumbing of BRAC University new campus project
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
The status of MEP IFC drawing
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
IFC drawing queries
av: Brac University
Publicerad: (2023) -
Confirmation of high voltage electrical conduit work in basement of BRAC University new campus project
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023)